====== Console > Resource Groups====== This page describes the sidebar 'Resource Groups'. \\ Return to [[211:server:publisher_console:index| 3DM Publisher Console]]\\ {{ :211:server:console_new:recourse_group_2030.png?nolink&600 |}} ==== Concepts ==== * Use Resource Groups to open multiple resources as one in a Publication. * Only homogeneous resources can be placed into one Resource Group. * For performance reasons, limit the number of resources to 10-50. ==== Specs & Tags ==== {{ :211:server:console_new:new_resource_group_2030.png?nolink&600 |}} Click 'New' in the top right corner to add a resource group. \\ * **Name** + **Description**: Fill in a name and description for the resource group. * **Date Start** + **Date Stop**: Fill in the start and stop date of collecting the data to use the resource group in the timeline. * **Type**: Changes automatically depending on the selected resources. * Toggle on the slider to add a resource to the resource group. * **Dynamic Resource group**: The runs of the resource group that are loaded in a publication will be limited to those where the coordinates of the center of the reference view are located in the bounding box * The Min-Z Fallback and Min-Z Fallback sets the vertical range wherein the runs will be loaded. * The distance indicates the horizontal radius wherein the runs will be loaded. The envelopes (bounding box) of the runs are used to check if they overlap with this search area. * The time indicates how long the runs stay loaded. If you switch from point A to B and the time is set to 10 seconds. If you go back to A within 10 seconds, the run will still be loaded. If you go to A in more than 10 seconds, the run will have to be reloaded.