This is documentation of an archived release.
For documentation on the current version, please check Knowledge Base.

Console > Resource Groups

This page describes the sidebar 'Resource Groups'.
Return to 3DM Publisher Console

Concepts

  • Use Resource Groups to open multiple resources as one in a Publication.
  • Only homogeneous resources can be placed into one Resource Group.
  • For performance reasons, limit the number of resources to 10-50.

Specs & Tags

Click 'New' in the top right corner to add a resource group.

  • Name + Description: Fill in a name and description for the resource group.
  • Date Start + Date Stop: Fill in the start and stop date of collecting the data to use the resource group in the timeline.
  • Type: Changes automatically depending on the selected resources.
  • Toggle on the slider to add a resource to the resource group.
  • Dynamic Resource group: The runs of the resource group that are loaded in a publication will be limited to those where the coordinates of the center of the reference view are located in the bounding box
    • The Min-Z Fallback and Min-Z Fallback sets the vertical range wherein the runs will be loaded.
    • The distance indicates the horizontal radius wherein the runs will be loaded. The envelopes (bounding box) of the runs are used to check if they overlap with this search area.
    • The time indicates how long the runs stay loaded. If you switch from point A to B and the time is set to 10 seconds. If you go back to A within 10 seconds, the run will still be loaded. If you go to A in more than 10 seconds, the run will have to be reloaded.
 
Last modified:: 2021/01/11 16:17